Gas_02 / Interconnection Pipeline Bosnia and Herzegovina - Croatia - West (Licka Jesenica-Trzac-Bosanska Krupa)

Brief project description

 Project will interconnect Bosnia and Herzegovina with Croatian gas transmission system and in this development phase will enable gasification of this part of Croatia and part of Una­Sana Canton on the west part of Bosnia and Herzegovina. In the future there is possibility that the pipeline (via Jajce) will be connected to the existing gas transmission pipeline. Main goal is to enable development of natural gas market and to introduce gas as environmental favourable fuel in residential, industrial and power generation sector.